BUDGET ESTIMATOR TOOL

USE THIS TOOL TO START YOUR BUDGETING AND FEASIBILITY PLANNING FOR YOUR COMMERCIAL BUILDING PROJECT.

This tool guides you through some of the main aspects of your building project. Using the form below please complete the details of your proposed building, and you will be automatically emailed the estimated budget range for your project. 

 

/ MAIN INFORMATION

Please select the option that best describes the use of your building from the below list.  If your building purpose is not listed in the available options, please contact one of our expert team to discuss further. 

This calculator tool assumes a concrete floor will be required in your building.
What is the purpose of your building?*
What is the total Square Metre (SQM) of your building?* Please exclude canopies and offices.
Do you require a concrete floor?*
Do you require an office space?
Office Ground Floor: total square metres
First Floor: total square metres
How much of the ground floor is in the main structure?

For offices and amenities there are varying grades, please see below examples of each; Base, Commercial, and Executive.

What type of office do you require?

/ CANOPY

Canopies provide crucial protection from the weather and are great for facilities where there is a lot of loading and unloading of trucks.
What is the total Square Metre (SQM) of canopy or canopies you require?

/ DRIVEWAY AND HARDSTANDS

What area of concrete do you require around the exterior of your building including under any canopies? 
What is the Square Metre (SQM) you require?

/ DOORS

Roller doors are the most common for industrial and commercial buildings. We've listed the standard roller door sizes below.  Please take into consideration the size of items being moved in or around the building.
How many roller doors do you require?
How many hangar sliding doors do you require?

/ WALLS

As default this calculator assumes the use of colored steel cladding, please use the fields below to upgrade to precast concrete.  Precast concrete is used to comply with fire regulations and provide additional durability.

If you are building closer than 15m to the neighbouring property boundary it is probable, you'll need fire protection on this wall.  Add precast concrete walls to include budget allowance for fire protection.

2m - 3m high precast is often used to provide greater durability where there are high vehicle movements or heavy machinery. 

Contact information

SUMMARY

Building - <% purpose %>
Size = <% SQM %>
Canopy
Size = <% canopySQM %>
Canopy
No
Driveway and hardstands
Size = <% drivewaySQM %>
Driveway and hardstands
No
Roller Door One - <% rollerDoorSize1 %>
Quantity = <% rollerDoorQuantity1 %>
Roller Door One
No
Roller Door Two - <% rollerDoorSize2 %>
Quantity = <% rollerDoorQuantity2 %>
Roller Door Two
No
Sliding door
Quantity = <% slidingDoorQuantity %>
No
Wall One - <% firewall1 %>
Size = <% firewall1Length %>(l) <% firewall1Height %>(h)
No
Wall Two - <% firewall2 %>
Size = <% firewall2Length %>(l) <% firewall2Height %>(h)
No
Wall Three - <% cladding1 %>
Size = <% cladding1Length %>(l) <% cladding1Height %>(h)
No
Wall Four - <% cladding2 %>
Size = <% cladding2Length %>(l) <% cladding2Height %>(h)
No
Concrete flooring
<% (concrete ? "Yes" : "No") %>
Office - <% officeType %>
No
Ground floor Size = <% groundFloorSQM %>
First floor Size = <% floor1SQM %>
Floors = 2
Floors = 1